Skip to content
Radda · JobeBuilding Your Future
Inspection of solar-powered electric tricycles at the assembly centre in Katsina, June 2026

Photo: Katsina State Government

Achievements
EnergyProjectOngoing

500 solar-powered electric tricycles, assembled in Katsina

Young people trained in EV technology are assembling the first 200 of 500 solar-powered Keke tricycles at a centre in Katsina.

500

Electric tricycles planned

200

First batch in assembly

In June 2026 Governor Radda inspected the assembly centre for the state's 500 Solar-Powered Electric Tricycles initiative. The first batch of 200 was being assembled.

Two batches of young people from across the state have been trained in electric-vehicle technology, assembly and maintenance, and are now doing the assembly work themselves. The scheme sits within the state's clean-transport drive alongside the CNG station and hybrid buses.

Gallery

Two green electric tricycles
Photo: Three Years in Office magazine, Katsina State Government
Electric tricycles parked in a row at the gas and charging station
Photo: Three Years in Office magazine, Katsina State Government

Sources

Figures are as reported in these sources. Most are the state government's own statements.

  1. 1Governor Radda Inspects Assembly Centre for 500 Solar-Powered Electric Tricycles InitiativeKatsina State Government· 20 Jun 2026
Now playingDikko Radda · Rarara